VIS (MCE)
tatsuki.washimi - 23:57 Wednesday 20 March 2024 (28915) Print this report
Comment to Installation of side stoppers for MCe (28901)

[Ushiba, Washimi]

Today's work at MCE:

  1. Visual inspection for the EQ stoppers, Coil & Magnets -> look fine, all magnets look to be almost centered in each coil bobbin
  2. Released the gluing jig for a magnet -> OK
  3. Released the HR/AR surface EQ stoppers -> no one was touched, but the magnets moved in a yaw direction in each coil bobbin
  4. Checked & center the oplev
  5. Brought closer the old-lower side-stoppers
  6. Brought closer the new-upper side-stoppers
  7. Brought closer the HR/AR surface EQ stoppers
  8. Checked the oplev -> gone out of the QPD
  9. Checked the EQ stoppers -> The HR/AR surface stoppers might be touched on the mirror -> Brought farther the HR/AR surface EQ stoppers
  10. Checked the oplev ->OK
  11. Suspension health check -> OK
  12. IMC alignment (klog28912)

Atouched files are final status photos

Images attached to this comment