Takano, Hirata, Akutsu; following 29282.
Afternoon, we checked beam dumps, and ghost beams caught by them in IFI and IMM chambers, and all seemed ok so far. The detailed check will be done next week.
- During this work, C-2-6 blank flange of IFI chamber was detached (Figs. 1 and 2).
- To do this, call PROVIDING_STABLE_LIGHT to IO Guardian, and then zero the ASC gain so that one can walk across the light beam toward IMMT1T (see also Day 1 work: 29261).
- Useful tool: a sensor card attached to a dentist mirror
- In addition, IMMT1 should be kept without oplev feedback tentatively when checking the back of IMMT1; this can be achieved by calling PAY_FLOAT to IMMT1 Guardian.
- Do not hesitate to check REFL DC value and the relevant gige camera image when calling ALIGNED to PRM.
- Refs: invac work finalization in 2022; you can link back from 22244. Highlight would be 21655, 21654, and 21578.
- I would like to repeat that this kind of work requires at least two optical interferometer experiment experts...