Routine confirmation of DGS maintenance day (Sep.10)
Routine checks for DGS maintenance day (Sep.10) were performed.
There are no problems except for the known ones.
Stepper motor
[Checked that the power supply can be controlled by BIO.]
Checked if power can be controlled by BIO.
Check if Script can be started.
Check that the limit switch installed is green.
[Check result]
No problem
Release Sensor
[Checked]
Confirmed that the Release Sensor is 0. 1: Seated
[Check result]
ETMY, ITMX, ITMY : No problem
ETMX_F1_1 : abnormal, no other problems (known)
Picomotor
[Checked]
PingTest is performed.
[Result]
NG:
ETMX: NG
SR2(IM): NG
=> Rebooted and recovered.
MCI,STM1,IMMT1,IMMT2:NG
AF_WFS,POP_POM,REFL_WFS,POP1,STM2: NG
=> Confirmation only, no recovery work done.
OK:
ITMX,ITMY,ETMY
BS(IM,BF),SRM(IM,BF),SR2(BF),SR3(IM,BF)
PRM(IM,BF),PR2(IM,BF),PR3(IM,BF)
MCF(MCO,MCI),MCE
OMMT1,OMMT2,OSTM
PCAL(EX1,EX2,EY1,EY2):Not confirmed because it is ON only when used.