I checked the condition around the SRM chamber.
Feedthrough flanges: The D-sub cables were put from the flanges to the cable rack (Picture #1) on the side of the booth.
- ICF203 on the bottom chamber for the IRM damper. The present flange with one D-sub 9pin port will be replaced with the flange with four D-sub 9pin ports (Picture #2).
- ICF203(P6) on the top chamber for the FLDACC H2 (Picture #3).
- ICF203(P3) on the top chamber for the FLDACC H1 and H3 (Picture #4).
SRM mirror holder: I checked the mirror holder in the decicator for OMC. The holder was assembled with the jig (Pictures #5 and #6).
IRM damper: The parts for the IRM damper were delivered and checked in the booth (Picture #7).