VAC (Valves & Pumps)
takashi.uchiyama - 16:42 Thursday 09 January 2025 (32286) Print this report
GVbsx and GVbsy have been closed
2024/01/09

The interlock system closed GVbsx and GVbsy around 11 AM. As GV closed, the pressure at the center area (IMC- BS- OMC) increased, and the pressure in IXC and IYC decreased.
The reason for the activation of the interlock system is unknown. It is possible that there was a malfunction of the vacuum gauge used for the monitor or a pressure increase due to leaks, etc.

To open GVbsx and GVbsy, we will monitor the pressure change and Qmass measurement until noon tomorrow and judge the results.
Comments to this report:
shinji.miyoki - 18:12 Thursday 09 January 2025 (32288) Print this report

Because Kimura-san started two TMPs/Dry pumps near BS(Kimura-san? will report) for the pumping in the MICH area, I,

  • turned off two Sunrise heaters near SR2+X side and PR3-Y side,
  • changed the target temp of the precision cooler near SR2 from 20.00 to 19.00.

to adjust the temperature around BS at around 18:00.

shinji.miyoki - 0:21 Friday 10 January 2025 (32294) Print this report

Owing to two TMP operations near BS, the vacuum level at the MICH area seemed to decrease and reached the equilibrium pressure? This means that more TMPs operation will result in the lower pressure.

The pressure difference at BS before and after closing GVs is just 2 times. 

So can we open GVs? or shall we temporally operate all TMPs in the MICH area and wait to reach the same vacuum level?

Images attached to this comment
shinji.miyoki - 13:49 Friday 10 January 2025 (32299) Print this report

Because TMPs will be off, I recovered the target temp for the precision cooler from 19 to 20 and turned off two Sunrise heaters around 14:00.

nobuhiro.kimura - 14:12 Friday 10 January 2025 (32300) Print this report

[Kimura and Yasui] 

GVbsx and GVbsy were opened in the following steps.

2Step 1: 

 13:45 Disabled the enable/disable switch in the GVbsx and GVbsy interlock device.

Step 2

13:48 Opened GVbsy and closed the GVs of the TMP.
BS-CC-10 pressure was 1.4 x 10^-5 Pa.

Step 3

13:50 Opened GVbsx and closed the GVs of the TMP.
BS-CC-10 pressure was 1.4 x 10^-5 Pa.

Results of the partial pressure measurement are as follows;

 

BS

IXC

IYC

Time

14:03

14:09

14:05

T.P. (Pa)

1.45 x 10^-5

 4.15 x 10^-6

5.73 x 10^-6

H2 (Pa)

2.00 x 10^-6

 1.68 x 10^-6

2.27 x 10^-6

H2O (Pa)

2.09 x 10^-6

 1.16 x 10^-6

1.62 x 10^-6

N2 (Pa)

5.54 x 10^-7

 5.61 x 10^-7

7.03 x 10^-7

O2 (Pa)

3.54 x 10^-7

 2.07 x 10^-7

2.48 x 10^-7

nobuhiro.kimura - 14:54 Friday 10 January 2025 (32301) Print this report

[kimura and Yasu]

 We turned off two TMPs and two dry-pumps at 14:50.

 

nobuhiro.kimura - 2:47 Saturday 11 January 2025 (32306) Print this report

[Kimura and Yasui]

 BS CC-10 pressure reached 7.5 x 10^-6 (Pa) at 16:10. 

The threshold of the CC-10 contact output was then set to (7.5 + 0.5) x 10^-6 (Pa) of 8.0 x 10^-6 (Pa). 

After setting, the interlock device was enabled.

 

nobuhiro.kimura - 7:56 Saturday 11 January 2025 (32312) Print this report

 

Results of the partial pressure measurement at 7:43 on Jan. 11 are as follows; 

Place

 BS

BS

IXC

IYC

Date

1/07

1/11

1/11

1/11

Time

 10:45

 7:43

 7:39

 7:44

T.P. (Pa)

 1.28 x 10^-5

 1.20 x 10^-6

 4.37 x 10^-6

 4.62 x 10^-6

H2 (Pa)

 1.42 x 10^-5

 1.52 x 10^-6

 1.65 x 10^-6

 2.01 x 10^-6

H2O (Pa)

 1.57 x 10^-6

 1.49 x 10^-6

 1.27 x 10^-6

 1.22 x 10^-6

N2 (Pa)

 6.18 x 10^-7

 5.05 x 10^-7

 6.22 x 10^-7

 6.04 x 10^-7

O2 (Pa)

 3.04 x 10^-7

 3.10 x 10^-7

 2.21 x 10^-7

 2.03 x 10^-7

 

The partial pressure of the residual gas components were recovered to the level before the interlock device operated and the gate valves closed.

 