Reports 1-1 of 1 Clear search Modify search
VAC (Valves & Pumps)
shinji.miyoki - 18:12 Thursday 09 January 2025 (32288) Print this report
Comment to GVbsx and GVbsy have been closed (32286)

Because Kimura-san started two TMPs/Dry pumps near BS(Kimura-san? will report) for the pumping in the MICH area, I,

  • turned off two Sunrise heaters near SR2+X side and PR3-Y side,
  • changed the target temp of the precision cooler near SR2 from 20.00 to 19.00.

to adjust the temperature around BS at around 18:00.

Search Help
×

Warning

×