Reports 1-1 of 1 Clear search Modify search
MIF (General)
ryousuke.sugimoto - 2:09 Thursday 14 March 2019 (8394) Print this report
Old Prometheus realignment to ALS Y optics.

Matteo, Tanioka, Izumi, Sugimoto

 

A new prometheus has a problem(81028150), and old Prometheus turned out to be healthy (8291).

So we swapped the New prometheus laser for the old one.

And, started alignment work to ALS Y optics. 

 

What we did about green

  • The double path AOM align to maximize the 1st oder beam (The beam on the opposite side of the side used in Xarm).
  • Cut beams other than 1st oder beam by iris 
  • Align to the EOM and, measure the beam power. (Before EOM 50mW, after EOM  48mW, before coupler 47mW)

 

Next

  • Well take alignment to fiber by same method as klog7538 (today, we didnt have short fiber).

 

What we did about IR

  • We adjust laser temperature and confirmed  that can find a bete-note signal by moklab. current temperature is 23.5℃however, the signal is too small. Signal is about 34.5dbm. before swapping, the signal was about 16.5dbm.
  • Maximiz the beam pass through the Faraday by adjusting the FI mount.

 

Next 

  • Take better alignment and improved beat-note signal power.
Images attached to this report
Search Help
×

Warning

×