Matteo, Tanioka, Izumi, Sugimoto
A new prometheus has a problem(8102, 8150), and old Prometheus turned out to be healthy (8291).
So we swapped the New prometheus laser for the old one.
And, started alignment work to ALS Y optics.
What we did about green
- The double path AOM align to maximize the 1st oder beam (The beam on the opposite side of the side used in Xarm).
- Cut beams other than 1st oder beam by iris
- Align to the EOM and, measure the beam power. (Before EOM 50mW, after EOM 48mW, before coupler 47mW)
Next
- We’ll take alignment to fiber by same method as klog7538 (today, we didn’t have short fiber).
What we did about IR
- We adjust laser temperature and confirmed that can find a bete-note signal by moklab. current temperature is 23.5℃however, the signal is too small. Signal is about 34.5dbm. before swapping, the signal was about 16.5dbm.
- Maximiz the beam pass through the Faraday by adjusting the FI mount.
Next
- Take better alignment and improved beat-note signal power.