[ Tomaru, Ushiba, Yamada, Rishabh, Miyamoto]
We checked the polarity of the coil magnet actuator.
We uploaded the summary file.
today's progress
- connected the cables between cryo-payload and digital system at EXV chamber
- removed the test D-sub cable
- checked the sensor and actuator connection
- checked the porality of the coil magnet actuator
- checked the Moving mass system operation