satoru.ikeda - 17:31 Monday 09 November 2026 (37823) Print this report
Installing MTP Cables for Y-End IO Chassis

YamaT-san, DanChen-san, Nakgaki-san, Infofarm(4 people), Ikeda

We installed fiber-optic cables from the 2nd floor of the Y End to the mini racks near DGS and EYA on the 1st floor.

Tomorrow, we plan to install and connect patch panels to the racks, as well as test the cables.

Non-image files attached to this report
Comments to this report:
satoru.ikeda - 16:07 Tuesday 10 November 2026 (37828) Print this report

> Tomorrow, we plan to install and connect patch panels to the racks, as well as test the cables.

We have completed the installation and connection of the patch panels in the rack, as well as cable testing.
Connections:
From 2F EY1 (Fig. 1) to 1F EY0: 12-fiber MTP cable with 3 wires (Fig. 2); to EYA: 2 wires (Fig. 3)

Since the delivery was delayed, only the two wires for EYA have female plugs on both ends.
Ultimately, all connections will have male plugs (with guide pins) on both ends.

Images attached to this comment
Non-image files attached to this comment