[Hirata, Dan, Takahashi]
This is a log of the work on the 25th. We performed the following tasks:
- Checked the FLDACC signals.
- Checked the height of the TM/RM.
- Released the breadboard and checked the height.
- Adjusted the gaps of the EQ stoppers and took the pictures.
- Checked the cables at the feedthrough flanges.
Details will be reported later.