I started the reassembly of the broken FLDACCs. #4 folded pendulum block was replaced with #7 block (Picture #1), which was transported with the special box (Picture #2) from NAOJ (Mitka). The assembled pendulum looks fine (Picture #3). The FLDACCs for SRM moved to the BS area temporarily to prevent troubles due to the cleaning of the SR-OMC booth (Picture #4).
I installed the poles to cover the table to store the MSBs removed from the SRM chamber (Picture #5).