Reports 1-1 of 1 Clear search Modify search
VIS (SRM)
ryutaro.takahashi - 17:57 Thursday 26 February 2026 (36450) Print this report
Comment to Preparation for SRM installation (36327)

I started the reassembly of the broken FLDACCs. #4 folded pendulum block was replaced with #7 block (Picture #1), which was transported with the special box (Picture #2) from NAOJ (Mitka). The assembled pendulum looks fine (Picture #3). The FLDACCs for SRM moved to the BS area temporarily to prevent troubles due to the cleaning of the SR-OMC booth (Picture #4).

I installed the poles to cover the table to store the MSBs removed from the SRM chamber (Picture #5).

 

Images attached to this comment
Search Help
×

Warning

×