A CAL Tcam session was performed to obtain beam position information necessary for Pcal. The parameters have already been updated, and SDF is expected to be accepted.
Operator: Shingo Hido Dan Chen
Update Time: 2025/08/01 09:20:38
| EPICS Key | Before [mm] | After [mm] | Δ (After - Before) [mm] |
|---|---|---|---|
| K1:CAL-PCAL_EX_TCAM_PATH1_X | 0.31554 mm | 1.09650 mm | +0.78096 mm |
| K1:CAL-PCAL_EX_TCAM_PATH1_Y | 64.42746 mm | 63.91376 mm | -0.51370 mm |
| K1:CAL-PCAL_EX_TCAM_PATH2_X | -0.45323 mm | 0.60969 mm | +1.06292 mm |
| K1:CAL-PCAL_EX_TCAM_PATH2_Y | -66.60012 mm | -67.05462 mm | -0.45450 mm |
Update Time: 2025/08/01 09:25:17
| EPICS Key | Before [mm] | After [mm] | Δ (After - Before) [mm] |
|---|---|---|---|
| K1:CAL-PCAL_EY_TCAM_PATH1_X | 0.79359 mm | 0.35370 mm | -0.43989 mm |
| K1:CAL-PCAL_EY_TCAM_PATH1_Y | 64.06099 mm | 63.96128 mm | -0.09971 mm |
| K1:CAL-PCAL_EY_TCAM_PATH2_X | -0.80309 mm | -1.00083 mm | -0.19774 mm |
| K1:CAL-PCAL_EY_TCAM_PATH2_Y | -70.22847 mm | -70.15549 mm | +0.07298 mm |