Reports 1-1 of 1 Clear search Modify search
CAL (Pcal general)
Shingo Hido - 9:37 Friday 01 August 2025 (34712) Print this report
Pcal Parameter Update Report

A CAL Tcam session was performed to obtain beam position information necessary for Pcal. The parameters have already been updated, and SDF is expected to be accepted.

Operator: Shingo Hido Dan Chen

Update Time: 2025/08/01 09:20:38

EPICS Key Before [mm] After [mm] Δ (After - Before) [mm]
K1:CAL-PCAL_EX_TCAM_PATH1_X 0.31554 mm 1.09650 mm +0.78096 mm
K1:CAL-PCAL_EX_TCAM_PATH1_Y 64.42746 mm 63.91376 mm -0.51370 mm
K1:CAL-PCAL_EX_TCAM_PATH2_X -0.45323 mm 0.60969 mm +1.06292 mm
K1:CAL-PCAL_EX_TCAM_PATH2_Y -66.60012 mm -67.05462 mm -0.45450 mm

Update Time: 2025/08/01 09:25:17

EPICS Key Before [mm] After [mm] Δ (After - Before) [mm]
K1:CAL-PCAL_EY_TCAM_PATH1_X 0.79359 mm 0.35370 mm -0.43989 mm
K1:CAL-PCAL_EY_TCAM_PATH1_Y 64.06099 mm 63.96128 mm -0.09971 mm
K1:CAL-PCAL_EY_TCAM_PATH2_X -0.80309 mm -1.00083 mm -0.19774 mm
K1:CAL-PCAL_EY_TCAM_PATH2_Y -70.22847 mm -70.15549 mm +0.07298 mm

 

Search Help
×

Warning

×