Reports 1-1 of 1 Clear search Modify search
CAL (General)
Shingo Hido - 17:38 Friday 25 July 2025 (34671) Print this report
Weekly calibration on 7/25
CAL group
We did the calibration measurements and updated the parameters.

Previous values are listed in klog#34597.

Estimated parameters in the Post-maintenance measurements are as follows.
 H_etmxtm = 3.826820474e-14 @10Hz ( -0.49% from previous-maintenance measurements)
 H_etmxim = 1.551001415e-14 @10Hz  ( 3.19% from previous-maintenance measurements)
 Optical_gain = 2.013447997e+12   ( -1.46% from previous-maintenance measurements)
 Cavity_pole = 18.113567910 Hz  ( 0.23% from previous-maintenance measurements)

Fig.1 show the fitting results.
Fig.2 show the ratio of the sensing function

Note: We were not able to perform morning calibration duo to large earthquake.
Images attached to this report
Comments to this report:
takahiro.yamamoto - 17:52 Friday 25 July 2025 (34672) Print this report

I updated line tracking parameters (JGW-L2314962).

All detected changes are coming from the planned commissioning activities.
- Changes in foton Fig.1 are related to klog#34671 (k1calcs).
- No changes in guardian (Fig.2).
- Changes in SDF tables shown in Fig.3-4 are related to this klog#34670 (k1calcs), and klog#34666 (k1calex, k1caley).
- No changes in the model (Fig.5).

Finally, I raised CFC_LACTCH and IFO guardian moved from CALIB_NOT_READY to READY.

Images attached to this comment
Search Help
×

Warning

×