[Kimura and M. Takahashi]
In order to suppress the pressure increase in TMSY, we installed an interlock circuit in the #35 pumping unit and restarted the TMP.
This restart of the TMP increased the pumping capacity around the EYC.
The time required to install the interlock circuit and restart the TMP was from 13:35 to 15:30.