[Tomura, Kamiizumi, Aoumi, Hirose]
Continued from klog29466.
I got advice at klog29552, we re-routed the cabled for WFSf3.
The re-routed cables are as follows.
- 4 D-sub cables that routed between the mini-rack and IOO1 rack and placed on the IO chassis power supply box. We routed to avoid the box.(FIG1)
- 1 D-sub cable that routed between the IOO0 rack and IOO1 rack and placed on the IO chassis power supply box. We routed to avoid the box.(FIG1)
- 4 D-sub cables that routed between the mini-rack and IOO1 rack.
One of the four was not routed without the ends aligned. Then we aligned the ends of all four cable.
Also, these cables were not tied to the column. So we tied them and the column.