[Takano, Washimi]
We performed a hammering test for the OMC stack (-X side), the same measurements and analysis as the IFI work (klog29482)
(See also the previous test, klog29310 )
- optical table -> optical table
- base plate -> optical table
- nothing -> optical table (as a reference)
- base plate -> base plate (2 sets)
- ground -> base plate (2 sets)