Reports 1-1 of 1 Clear search Modify search
VIS (OMM)
tatsuki.washimi - 17:54 Wednesday 24 April 2024 (29310) Print this report
Comment to Visual inspection of Stack (29245)

[YokozaWashimi, Tanaka, Ozaki, Sudo]

Today we tried to evaluate the seismic isolation of the OMC stacks, using a 3-axial accelerometer (S2315344) and an impact hammer (G1910656).
This is a quick report.

  1. Locating the ACC on the OMC vac-table (Fig.1, Fig.2)
  2. Tapping each stack (top, middle, bottom of stack1, stack2) with the impact hammer (direction: Fig.3)
  3. Picking up each pulse (-0.2/+0.8 sec) and calibrating its transfer functions from impact [N] to acceleration [m/s2] automatically (example: Fig.4, Fig.5)
  4. Calculating averages of the events (Fig.6, Fig.7)
Images attached to this comment
Search Help
×

Warning

×