[Hirata, Dan Chen-san]
We took photos for PRM payload earthquake stops. I uploaded today's photo to KAGRA dropbox.
During this work, we found two earthquake stops for test mass AR side were very close to the mirror surface(within 1mm?). We talked with Takahashi-san and Ushiba-san, and decided to withdraw them.