(Log on 19th)
[Takahashi, Hirata, Washimi, Ikeda]
We re-cabled the in-vacuum cables for the MCe suspension. The 22-pin Burndy cable for the pico-motors and the 4 coaxial BNC cables for the magnet-coil actuators had been connected from the suspension to the feedthrough flange directly. We anchored the cables on the 1st and 2nd stages of the stack with the cable clamp.