Reports 1-1 of 1 Clear search Modify search
VIS (PR3)
naoatsu.hirata - 16:45 Thursday 29 February 2024 (28718) Print this report
Comment to PR3 recovery work (28509)

[Hirata, Ikeda-san, Takahashi-san]

We measured PR3 Traverser position.

  • We opened PR3 chamber top part. Removed bolts are in the plastic box near the chamber.
  • We measured position of Traverser by caliper. The result is attached(Pic.1). 
  • Previous position was written on klog:21607(2022/7/26). Pic.2 shows the rough differece between today and 2022/7/26.
Images attached to this comment
Search Help
×

Warning

×