[Hirata, Takahashi-san, Dan Chen-san, Ikeda-san]
We assembled PRM IM OSEM holders which were modified at Mitaka, and adjusted OSEM position. All OSEM flags are not touching.
- We assembled OSEM holders and OSEM with IMR.
- Payload part were released and checked tilt Oplev. Oplev was not on the QPD. It was shifted Yaw direction, and little bit Pitch direction. We adjusted it to "0".
- After recovering tilt Oplev, we checked OSEM position and adjusted again.
- Almost all OSEM signals were out of range. So we adjusted them. Target was 6000 counts.
- We checked tilt Oplev and OSEM position again. And adjusted bad one again. It looks all OSEM flags are not touching.
- We checked earthquake stops, and closed the chamber side door.
After this work, Takahashi-san talked with Ushiba-san. And we realized BF and SF LVDT position was far from the set point. So, Takahashi-san did off-loading.(It will report later.)