[Ushiba, Washimi]
We checked the viewing of the MCe suspension (the IRM was lifted up) by eyes.
Since it looked fine, we made down the IRM to the nominal position. After this work, we checked the all magnets of the IRM were not touched to the IM by eyes. (The picture 4 is the closest magnet.)
Finally, we rereased the all earthquake-stoppers.
After this work, the oplev beam was hit in the QPD without any tuning.