FCL (General)shoichi.oshino - 14:23 Friday 20 October 2023 (27279)
Print this reportNew air conditionerThe new air conditioner has been installed in the computer room in the mine. This is the third air conditioner in the computer room. The overall room temperature is lower than before. We will see the stability of temperature for a while.