Reports of 89 Clear search Modify search
FCL (General)
shinji.miyoki - 9:02 Thursday 29 February 2024 (28701) Print this report
Cleaning of the ceiling doors at PR3

[miyoki, omae, yamaguchi, yoshimura]

We put a cover over the floor at 2F area around PR3 and the top hut of the PR3 tank. In addition, we cleaned the outside of 3 ceiling doors on the PR3 tank.

FCL (General)
takaaki.yokozawa - 12:35 Thursday 22 February 2024 (28666) Print this report
Made the aluminum beam duct between BS and SR2
[Dan, Yuzu, Yokozawa]

We made the aluminum beam duct between BS and SR2
Images attached to this report
FCL (General)
shinji.miyoki - 13:24 Monday 19 February 2024 (28621) Print this report
Cleaning of the ceiling doors at PR2

[miyoki, omae, yamaguchi, yoshimura, hayakawa]

We put a cover over the floor at 2F area around PR2 and the top hut of the PR2 tank. In addition, we cleaned the outside of 3 ceiling doors on the PR2 tank.

FCL (General)
shinji.miyoki - 8:14 Saturday 06 January 2024 (28186) Print this report
Comment to Camera movie sample when earthquake happens (28161)

The movie is for L2 at KAGRA site due to M5.3 around 05:26 on the 6th, Jan. Actually, the swing amplitude and duration are larger and longer than L1.

Non-image files attached to this comment
FCL (General)
shinji.miyoki - 8:06 Thursday 04 January 2024 (28161) Print this report
Camera movie sample when earthquake happens

I started taking movies in the corner station only when the camera auto-taking was triggered by shaking, such as earthquakes. The movie is about the bar on the ladder near IYC from the camera set on BS's clean booth's cable rack. The magnification is x 30. I will select a better position for monitoring.

I guess the pitch and Yaw motion of the camera will be enhanced on the cable rack by earthquakes because of the not-so-strong support of the cable rack.

The attached movie corresponds to M4.8 at 0:37-38 on 4th Jan. The camera could show the shaking in the corner station even the Japanese earthquake level was 1 in the Mozumi area (L1 cannot be sensed by most people).

Non-image files attached to this report
Comments to this report:
shinji.miyoki - 8:14 Saturday 06 January 2024 (28186) Print this report

The movie is for L2 at KAGRA site due to M5.3 around 05:26 on the 6th, Jan. Actually, the swing amplitude and duration are larger and longer than L1.

Non-image files attached to this comment
FCL (General)
shoichi.oshino - 15:08 Monday 27 November 2023 (27735) Print this report
Check Web camera at IY GV
Miyoki-san found that the network connection of Web camera at IY GV was bad.
I checked the Wi-Fi network and found that the latency was 13 ms, which is fine.
I restarted the web camera just in case.
FCL (General)
shinji.miyoki - 19:46 Monday 13 November 2023 (27596) Print this report
Comment to KAGRA SAVIC-net improvement (27592)

A note PC in the Fan Room. Please don't touch it.

Images attached to this comment
FCL (General)
shinji.miyoki - 17:38 Monday 13 November 2023 (27592) Print this report
KAGRA SAVIC-net improvement

Purpose

KAGRA SAVIK-net and warning mail sending can work during a power outage.

Present situations and some actions

  • Each KAGRA SAVIK-net instrument at "the Atotsu Fan room", "the Corner Pre-Room" and "the Yend Pre-room" seems to have a battery for a PC and its instrument. In addition, they are connected with each other by their own optical fibers --> OK.
  • We don't know the situation of many sensors that should send signals that tell their status. (Cubicles, Water pumps, Fan, O2 sensors etc.) ---> We need checks.
  • A warning mail-sending PC that was added by me at the Hokubu-kaikan circuit-making room was a notebook-type PC --> Additional battery is not necessary because it has its battery inside. However, the network switch that is connected with this PC and the general network switches in DAB/Hokubukaikan and in the KAGRA site have no battery. ---> Batteries are necessary for some of these network switches. 
  • In addition, this warning mail-sending system relies on SINET at SK and the KAGRA network. --> If there is a power outage in a wide area around Higashimozumi and KAGRA, these networks will be down. So it is better to prepare an independent network for one more warning mail-sending PC  ---> Today, I added one more note PC that is connected with the CATV network in the Atotsu Fan Room, and a battery for the CATV router and the network switch of KAGRA in the fan room. But, the actual usage of this battery will be done on 1st December when the power line check will be done for the Atotsu cubicle. (Note: we don't know whether the CATV network can be alive or not if there's a power outage around the Higashimozumi-area, because it should have some signal boosters that require electrical power. Actually, such as a star link network is maybe an ideal solution to be free from electrical power in the internet.)
Comments to this report:
shinji.miyoki - 19:46 Monday 13 November 2023 (27596) Print this report

A note PC in the Fan Room. Please don't touch it.

Images attached to this comment
FCL (General)
shoichi.oshino - 14:23 Friday 20 October 2023 (27279) Print this report
New air conditioner
The new air conditioner has been installed in the computer room in the mine.
This is the third air conditioner in the computer room.
The overall room temperature is lower than before.
We will see the stability of temperature for a while.
Images attached to this report
FCL (General)
satoru.ikeda - 14:55 Friday 06 October 2023 (27106) Print this report
EXV IM heater power supply installed and DSUB cable replaced

Ushiba-san, Ikeda

I installed the power supply for the EXV IM heater.
I then restored power and networking to STEPPER.
This completes the entire IM heater installation.

The usage is the same as K-Log26694.
https://klog.icrr.u-tokyo.ac.jp/osl/?r=26694

About the network

We removed the unused network switch from the DGS.
This was then converted to PICO.

Front room -> VIS mini rack Port7.
-> this SW 
 Port.1: to mini rack
 Port.2: Stepper Power Supply
 Port.3: IM Heater Power Supply
 

Images attached to this report
Non-image files attached to this report
FCL (General)
satoru.ikeda - 17:50 Friday 22 September 2023 (26862) Print this report
EYV's IM heater connected to the power supply and also IXV ,IYV's DSUB cables replaced

Ushiba-san, Ikeda

EYV's IM heater was connected to the power supply and the DSUB cables of IXV and IYV were replaced.

EYV connected MOVING MASS to Port.4 of PicoNetworkSwitch and IM HEATER to Port.5.

The usage is the same as K-Log26694.

Non-image files attached to this report
FCL (General)
satoru.ikeda - 5:15 Thursday 14 September 2023 (26759) Print this report
Comment to Installation and Remote Control of Power Supplies to IM Heaters in IX, IY (26694)

New Pico Networks network switches installed in an IXV2 rack.

And connected with IM heater power supply.
IXV 1st:
 Port.1: Trunk (Poe power)
 Port.2: to 2nd
 Port.3: StepperFR
 Port.4: StepperIP
 Port.5: ITXX Picomotor
 Port.6:Standalone Stepprmotor
 Port.7: Pico rebooter
 Port.8: VIS temperature regulator

IXV 2nd:

 Port1: from 1st
 Port2: MovingMass power supply
 Port3: IM Heater power supply
 OtherPort: Empty

FCL (General)
satoru.ikeda - 16:18 Friday 08 September 2023 (26694) Print this report
Installation and Remote Control of Power Supplies to IM Heaters in IX, IY

Ushiba-san, Ikeda

I connected the power supply to the IM heaters of IX and IY and also connected LAN.
IX did not have a connecting cable to DSUB and could not connect to the output of the power supply.


IY connected power supply to LAN.
IX did not have a free port on the network switch, so only the IP address was set and no connection was made.

PicoNetworkSwitch:
IX:
 Port 6: IM heater
IY:
 Port 7: IM heater power supply
 Port 8: Moving mass

Usage:
WEB Interface is sitemap-FCL-PowerSupply(Web Interface)
After entering the usual password, ssh automatically, set port forward, and open Firefox.
When you close it, close Terminal as well.

Cable documentation:JGW-E2315309
 

Images attached to this report
Non-image files attached to this report
Comments to this report:
satoru.ikeda - 5:15 Thursday 14 September 2023 (26759) Print this report

New Pico Networks network switches installed in an IXV2 rack.

And connected with IM heater power supply.
IXV 1st:
 Port.1: Trunk (Poe power)
 Port.2: to 2nd
 Port.3: StepperFR
 Port.4: StepperIP
 Port.5: ITXX Picomotor
 Port.6:Standalone Stepprmotor
 Port.7: Pico rebooter
 Port.8: VIS temperature regulator

IXV 2nd:

 Port1: from 1st
 Port2: MovingMass power supply
 Port3: IM Heater power supply
 OtherPort: Empty

FCL (General)
nobuhiro.kimura - 15:20 Friday 07 July 2023 (25891) Print this report
Comment to Disposal of Unnecessary Metal Parts and Other Items (25838)

Workers:

Kimura and M. Takahashi

Abstract:

Items temporarily stored in the parking lot were brought into the central machine room.
The items brought in were spare parts for ICF305 gate valves, ICF152 gate valves, and ICF70 gate valves.
These items are stored in the central machine room.
The parking lot was released from occupancy accordingly.

Images attached to this comment
FCL (General)
nobuhiro.kimura - 12:27 Wednesday 05 July 2023 (25856) Print this report
Comment to Disposal of Unnecessary Metal Parts and Other Items (25838)

Workers:

Kimura, M. Takahashi, Omae, Yamaguchi, Yasui and Kamioka-kogyoh members

Abstaract:

Today ( July 5) morning, unnecessary metal materials collected in the parking lot space were taken out to the Sunouchi Warehouse.
After that, items to be stored (mainly Gate Valves (ICF305)) were brought in from the Sunouchi warehouse and temporarily placed in the parking lot space.
The temporarily stored items are scheduled to be brought into the storage space in the central machine room on Friday ( July 7).

Images attached to this comment
FCL (General)
nobuhiro.kimura - 14:52 Tuesday 04 July 2023 (25838) Print this report
Disposal of Unnecessary Metal Parts and Other Items

Workers:
 KImura, M. Takahashi, Omae, Yamaguchi and Yasui


Abstract:
In order to dispose of unnecessary metal parts and other materials in the KAGRA mine, we collected them in the parking lot.
The disposal is scheduled to take place on the morning of July 5.
We will also bring in materials from the Sunouchi-Sohko to be stored in the central machine room.
The materials brought in will be temporarily placed in the parking lot.

Images attached to this report
Comments to this report:
nobuhiro.kimura - 12:27 Wednesday 05 July 2023 (25856) Print this report

Workers:

Kimura, M. Takahashi, Omae, Yamaguchi, Yasui and Kamioka-kogyoh members

Abstaract:

Today ( July 5) morning, unnecessary metal materials collected in the parking lot space were taken out to the Sunouchi Warehouse.
After that, items to be stored (mainly Gate Valves (ICF305)) were brought in from the Sunouchi warehouse and temporarily placed in the parking lot space.
The temporarily stored items are scheduled to be brought into the storage space in the central machine room on Friday ( July 7).

Images attached to this comment
nobuhiro.kimura - 15:20 Friday 07 July 2023 (25891) Print this report

Workers:

Kimura and M. Takahashi

Abstract:

Items temporarily stored in the parking lot were brought into the central machine room.
The items brought in were spare parts for ICF305 gate valves, ICF152 gate valves, and ICF70 gate valves.
These items are stored in the central machine room.
The parking lot was released from occupancy accordingly.

Images attached to this comment
FCL (General)
shinji.miyoki - 10:37 Wednesday 22 March 2023 (24480) Print this report
FFU off near IMC tube

I noticed that one FFU for a stocking area along the IMC duct tube is operated. I turned off it.

FCL (General)
shinji.miyoki - 20:20 Wednesday 28 December 2022 (23419) Print this report
V area activities

The followings are Monday's activities,

  • EYV 10:03
  • EYV 11:02
  • IYV 11:36
  • IXV 11:37
FCL (General)
shinji.miyoki - 12:34 Monday 12 December 2022 (23207) Print this report
V area activities

The followings are Monday's activities,

  • EYV 9:55
  • EXV 9:37~38
  • IYV 10:18~10:19
  • IXV 10:20~10:21
    FCL (General)
    shinji.miyoki - 8:35 Tuesday 06 December 2022 (23136) Print this report
    V area activities

    The followings are Monday's activities,

    • EYV 9:54~9:55
    • EXV 9:40
    • IYV 10:23
    • IXV 10:25
    FCL (General)
    shinji.miyoki - 15:23 Monday 21 November 2022 (22988) Print this report
    V area activities

    The followings are today's activities,

    • EYV 9:59
    • EXV 10:58
    • IYV 10:02~10:03
    • IXV 10:03~10:04
    FCL (General)
    shinji.miyoki - 12:30 Monday 14 November 2022 (22905) Print this report
    V area activities

    The following are the V area activities, 

    • EYV 10:02
    • EXV 11:01
    • IYV 9:27~9:28
    • IXV 9:29~9:30
    FCL (General)
    shinji.miyoki - 16:08 Monday 07 November 2022 (22816) Print this report
    V area activities.

    V area activities.

    • EYV  9:59~10:00
    • EXV  9:50~9:53
    • IYV    10:35~10:37
    • IXV  10:38~10:40
    FCL (General)
    shinji.miyoki - 16:39 Thursday 09 June 2022 (21085) Print this report
    Comment to Stepping floors around AS table (21055)

    I added more as photos. The plate along the shorter side is just put on the plates along the longer side by using rubber sheet.

    So please be careful of the hight difference between them. Please walk slowly around AS tables.

    Images attached to this comment
    FCL (General)
    shinji.miyoki - 8:24 Wednesday 08 June 2022 (21055) Print this report
    Stepping floors around AS table

    [miyoki, hayakawa, yoshimura, takahashi]

    At present, the optical axis level on the AS table can be same with eyes of some researchers in KAGRA. So we are now putting stepping floors to enhance the floor hight to avoid this situation. (no photo, sorry)  We believe this no troubles for other researchers because the ceiling hight is high enough around the AS table.

    Comments to this report:
    shinji.miyoki - 16:39 Thursday 09 June 2022 (21085) Print this report

    I added more as photos. The plate along the shorter side is just put on the plates along the longer side by using rubber sheet.

    So please be careful of the hight difference between them. Please walk slowly around AS tables.

    Images attached to this comment
    Search Help
    ×