FCL (Water)
tatsuki.washimi - 16:52 Monday 27 March 2023 (24553) Print this report
Water pipe configuration change

Today the configuration of the drain water pipes in the Y-arm was changed.

Finally, the pumps for the in-room pipes are stopped.

The readout of the flow meter becomes stable.

Images attached to this report
Comments to this report:
tatsuki.washimi - 17:53 Monday 27 March 2023 (24556) Print this report

I also checked the spectrum of the portable seismometer located in the Y-end 1F.

Increasing around 1Hz and 20Hz after 13:45 is clearly seen.

There is no change around 11:11 work and it is consistent with the result of last week's study; the vibration of the in-room pipes is not propagated to the floor so much.