Reports 1-1 of 1 Clear search Modify search
AOS (Beam Reducing Telescopes)
tomotada.akutsu - 13:36 Thursday 06 October 2022 (22378) Print this report
TMSY finalization for in-vac use: Day 3

Hirata, Akutsu; following 22364.

Summary

  • Fig. 1: installed the Cat.B viewport window left yesterday (22364) to extract the Y-arm transmission light beam to the subsequent optics on the in-air table. 5->10->15 Nm as usual. M8x40 bolts and small washers are used as usual.
  • Fig. 2: Installed an oplev viewport (#11 as labaled).
  • Tightened signal cable screws.
  • Checked inside the EYT chamber.

Yet incomplete viewport flanges

Kimura-san et al will take care to do complete sealing of yet incomplete viewport flanges listed below.

  • Three signal ports flanges in the lower height (Figs. 3-5). Metal gaskets have been already set since the other day (21817).
  • Side hatches.
Images attached to this report
Search Help
×

Warning

×