Reports 1-1 of 1 Clear search Modify search
VIS (General)
satoru.ikeda - 14:55 Friday 10 December 2021 (19167) Print this report
Comment to Routine confirmation of DGS maintenance day (17831)

Routine check for DGS maintenance day (Dec. 10)

Stepper motor
 [Checked if the power supply can be controlled by BIO.]
  Check if the power supply can be controlled by BIO.
  Check if the script can be started.
  Confirmed that the limit switch installed is in Green.
 [Check result]
  No problem.
 However, ETMX is not confirmed yet because it is in use.

Release Sensor
 [Confirmed]
 Confirmed that Release Sensor is 0. 1: Seated
 [Check result]
 ETMX, ETMY, ITMX, ITMY : No problem
 
Picomotor
 [check details]
  Performed PingTest
 [Check result]
  SR2_IM:NG
   =>Restarted and restored.

 NG:
  MCI,STM1,IMMT1,IMMT2
  AS_WFS,POP_POM,POS_POM,REFL_WFS,POM1
  MCF(MCO,MCI)
   => Confirmation only, no recovery work was done.

 OK:
  ETMX,ETMY,ITMX,ITMY
  BS(IM,BF),SRM(IM,BF),SR2(BF,STM),SR3(IM,BF)
  PRM(IM,BF),PR2(IM,BF),PR3(IM,BF)
  MCE
  OMMT1,OMMT2,OSTM

  PCAL(EX1,EX2,EY1,EY2):Not confirmed since it is ON only when used.

Temperature controller
 [Checked]
 Check if the temperature acquisition is working properly.

 [Check result]
  No problem
 

Images attached to this comment
Non-image files attached to this comment
Search Help
×

Warning

×