Routine confirmation of DGS maintenance day (9/24)
Routine checks for DGS maintenance day (9/24) were performed.
There are no problems except for the known ones.
Stepper motor
[Checked that the power supply can be controlled by BIO.]
Checked if power can be controlled by BIO.
Check if Script can be started.
Check that the limit switch installed is green.
[Check result]
No problem
Release Sensor
[Checked]
Confirmed that the Release Sensor is 0. 1: Seated
[Check result]
ETMY, ITMX, ITMY : No problem
ETMX_F1_1 : abnormal, no other problems (known)
Picomotor
[Checked]
PingTest is performed.
[Result]
NG:
SR3_IM: NG
ETMX: NG
ETMY: NG => Both rebooted and came back.
ETMY: NG
=> Can't connect to the rebooter either. Power disconnected? Unknown cause. Will check on Monday.
SR2_STM: NG
=> The rebooter is not installed yet, so I will install it next week and get it back.
MCI,STM1,IMMT1,IMMT2:NG
AS_WFS,POP_POM,POS_POM,REFL_WFS,POM1: NG
=> Confirmation only, no recovery work done.
OK:
ITMX,ITMY
BS(IM,BF),SRM(IM,BF),SR2(IM,BF),SR3(BF)
PRM(IM,BF),PR2(IM,BF),PR3(IM,BF)
MCF(MCO,MCI),MCE
OMMT1,OMMT2,OSTM
PCAL(EX1,EX2,EY1,EY2):Not confirmed because it is ON only when used.