Reports 1-1 of 1 Clear search Modify search
VIS (General)
satoru.ikeda - 15:57 Friday 17 September 2021 (18295) Print this report
Comment to Routine confirmation of DGS maintenance day (17831)

Routine confirmation of DGS maintenance day (9/17)

Routine checks for DGS maintenance day (9/17) were performed.
There are no problems except for the known ones.

Stepper motor
 [Checked that the power supply can be controlled by BIO.]
  Checked if power can be controlled by BIO.
  Check if Script can be started.
  Check that the limit switch installed is green.
 [Check result]
  No problem

Release Sensor
 [Checked]
 Confirmed that the Release Sensor is 0. 1: Seated
 [Check result]
 ETMY, ITMX, ITMY : No problem
 ETMX_F1_1 : abnormal, no other problems (known)

Picomotor
 [Checked]
  PingTest is performed.
 [Result]

 NG:
  BS_BF:NG
   => Rebooted and recovered.
  SR2_STM:NG
   => The power supply was almost disconnected, so I asked Hirata-san to plug it back in.
  MCI,STM1,IMMT1,IMMT2:NG
  AS_WFS,POP_POM,POS_POM,REFL_WFS,POM1: NG
   => Confirmation only, no recovery work done.

 OK:
  ITMX,ITMY,ETMX,ETMY
  BS(IM,BF),SRM(IM,BF),SR2(IM,BF,STM),SR3(IM,BF)
  PRM(IM,BF),PR2(IM,BF),PR3(IM,BF)
  MCF(MCO,MCI),MCE
  OMMT1,OMMT2,OSTM

  PCAL(EX1,EX2,EY1,EY2):Not confirmed because it is ON only when used.
  

Images attached to this comment
Non-image files attached to this comment
Search Help
×

Warning

×