[Tamaki, Ushiba with help of Miyo]
As I reported in klog17152, the inclination of ITMX was changed after removal of the first contact especially for pitch inclination.
First, we recovered the alignment by using moving mass on MN stage but it couldn't due to the lack of the range, which is close to the limit due to the alignment work posted in klog16863.
So, I onece fixed the suspension and move the ballast masses for alignment and offload of moving mass.
After this work, we can align the ITMX with respect to the TM OpLev reference.
Then, we centered all the MN OpLev (TILT, LEN, ROL, TRA, VER).
In this night, we (Miyo-kun) run the script to measure the TF of the suspension for health check.
Note: During this work, I noticed actuator magnets hit the coil before suspension hit the earthquake stops and one magnet (MNH3) obtained some forces.
As far as my visual inspection, the magnet looks healthy but we need to investigate it by measuring the TF.
Also, I learned the gap between MN and earthquake stops from MNR should be close in order not to touch the magnet to the coil bobins, so I set the gap between them roughly 3 mm in this time.