Reports 1-1 of 1 Clear search Modify search
AOS (Beam Reducing Telescopes)
satoshi.tanioka - 0:03 Thursday 23 August 2018 (5875) Print this report
TMS-VIS damping

at Mitaka

Recently I engaged in damping control of TMS-VIS.
I did diagonalization of matrices of LVDTs and COIL actuators.
Then I adapted damping filters for each 6 modes (L, T, V, R, P, Y) simultaneously and the peaks were damped.
Obtained spectra of each DoFs are below.

Compared to the spectra without damping control, the resonant peaks are decreased (REFs are with damping).

See also here.

Images attached to this report
Comments to this report:
tomotada.akutsu - 20:57 Tuesday 11 September 2018 (6098) Print this report

Akutsu, Uraguchi at Mitaka

About the TMS-VIS, we found an LVDT's electric wire cut during the preparation of the shipping...cryingcryingcrying

We don't know when and why this happened. If I have time I'll recover it at Mitaka; otherwise the rework will be done at Kamioka.

Images attached to this comment
Search Help
×

Warning

×