Reports 1-1 of 1 Clear search Modify search
CAL (YPcal)
dan.chen - 1:19 Friday 18 November 2022 (22954) Print this report
Preparation for a shutter install in YPcal

Date: 2022/11/17

With Rishabh and Shingo

We made a circuit box which has a relay in it, and tested it in YPcal area with the new shutter will be installed in YPcal Tx module.
It works as expected.
We will install the shutter tomorrow.

Images attached to this report
Comments to this report:
dan.chen - 6:47 Friday 18 November 2022 (22955) Print this report

The circuit box.

The design document: JGWdoc

Images attached to this comment
Search Help
×

Warning

×