Reports 1-1 of 1 Clear search Modify search
AOS (Baffles & Beam dumps)
tomotada.akutsu - 20:31 Thursday 29 November 2018 (7197) Print this report
NAB#2 finalize at IYA with wiring of the baffle PDs' wires

Miyazaki, Akutsu

  • Fixed the feet of the inner tower in the IYA chamber by longer clamps and suitable shims. Then each of the four feet was fixed to the base plate by two clamps.
  • The TCam's steering mirror was attached to the inner tower (see 7196) with Yokozawa-san.
  • Re-arranged the wiring paths of the electric wires from the baffle PDs; the Dsub mount was also fixed to the inner tower.
Images attached to this report
Search Help
×

Warning

×