[Takahashi(NAOJ), Sato, Tomaru, Araki, Ushiba]
We set the height of the mirror at 5.8mm lower than the nominal position.
After that, we adjusted the yaw position in order for OpLev beam to hit almost the center of the QPD.
Then, we checked all the earthquake stops for the cryogenic payload and finalize them.
After this work, Akutsu-san and Simon will finalize the WAB.
Tomorrow morning, we will clean inside the cryostat and Mirapro Co. will close the flanges.