Tuesday 03.06 with Mark and Hirata-san.
- We adjusted the SF yoke to 6 [mm] abobe the baseplate. Before it was at 13-14[mm].
- We set the keystone to 65.5 [mm] on the -L side. Then it was at 65.7 [mm] on the +T side and 65.6 [mm] on the +L side. This means is level enough.
- We completed the calibration of the SF GAS LVDT.
Offset: 4740 [ctn]
Calibration Factor: 1/(11067.09 [cnt/mm]) = 0.0904[µm/cnt]
And then we set the offset and the calibration factor into the INPUT FILTER Block and we took an Snapshot.
And then we set the offset and the calibration factor into the INPUT FILTER Block and we took an Snapshot.
And then we set the offset and the calibration factor into the INPUT FILTER Block and we took an Snapshot.
And then we set the offset and the calibration factor into the INPUT FILTER Block and we took an Snapshot.