[Sato, Miyakawa, Hirose]
In preparation for changing the length of the IMC, we installed an HWP after the IR shutter in the PSL room in order to switch the incident light from S-polarisation to P-polarisation. (The current optical setup is shown in Fig1.)
-
Unlocked the IMC.
-
Installed a PBS and confirmed that most of the light was reflected using a sensor card.
-
Installed an HWP and placed a PBS immediately after it. Confirmed that most of the light was transmitted using a sensor card.
-
Removed the PBS after the confirmation.