Reports 1-1 of 1 Clear search Modify search
CRY (Cryostat EX)
nobuhiro.kimura - 8:51 Thursday 01 October 2026 (37587) Print this report
Opened a side flange of EXC

[Kimura and Yasui]
 On September 30, we opened the -Y-side flange of the EXC cryostat for an internal inspection of the EXC.
We then carried out preparatory work to enter the EXC.
We attached a protective sheet to the opened side flange to prevent dust from entering.

Comments to this report:
nobuhiro.kimura - 21:11 Wednesday 07 October 2026 (37624) Print this report

[Kimura, Yasui. H.Sawada and M.Takahashi]
 We temporarily closed the side flange on the -Y side of the EXC.
After completing the tightening work, we cleaned up the area around the EXC clean booth.
 The cleanup work included removing compressed air cylinders for venting to atmosphere in EXC and flexible piping for the duct-shield cryocooler unit of TMSX side called Xer.
After performing a health check on the EXC suspension, we will tighten the side flange mounting bolts to the specified torque. We then plan to begin evacuating the EXC.

takashi.uchiyama - 16:59 Friday 09 October 2026 (37641) Print this report
2026/10/9

Sawada, Takahashi, Uchiyama

Finally, we closed dir. 800 flange with proper torque (20 -> 40 -> 60 -> 60 Nm).
After that, we started pumping down EYC by the dry pump at EYA from 13:30.
takashi.uchiyama - 8:14 Sunday 11 October 2026 (37645) Print this report

Vacuum pressure level reached 4 Pa at EXA.
The vacuum pressure reached 20 Pa which is the vacuum pressure we can start TMPs at 12 AM on 10 October.
Almost 1 day is needed to pumping down from 1 atm to 20 Pa.
Images attached to this comment
takashi.uchiyama - 11:03 Sunday 11 October 2026 (37646) Print this report
2026/10/11

Ushiba, Uchiyama

We started the TMP operation in the EX area.
We started the TMPs at #32, #33, #39, #37, #27, and #31.

We stopped the air dryer in the machine room as follows,
1. Turn off the main SW of the compressor. Fig. 2
2. Close the valve between the compressor and the tank. Fig. 3
3. Slightly open the vent valve under the tank. Fig. 4
4. Turn off the electrical breakers for the compressor and dryer. Fig. 5 and Fig. 6
Images attached to this comment
takashi.uchiyama - 8:16 Tuesday 13 October 2026 (37647) Print this report
2026/10/13

Fig. 1 shows the current vacuum pressure.
Fig. 2 shows changes of the vacuum pressure at several points in EX.

According to Fig. 2, the vacuum pressure continuously decreased. No serious leak can be expected.
Images attached to this comment
takashi.uchiyama - 13:41 Tuesday 13 October 2026 (37652) Print this report
2026/10/13
Kimura, Uchiyama

We opened GVex and activated the interlock for GVex. We performed the following actions:

- At TMSX (#27), we turned off TMP.
- At EXV, we closed GV at the pumping unit #31 and started the ion pump.
- At EX 1F, we turned on another air cooler, bringing the total number of air coolers operating in EX 1F to two.

Images attached to this comment
nobuhiro.kimura - 16:08 Tuesday 13 October 2026 (37655) Print this report

[Kimura]
 I turned on the Q-mass installed in the EXC into operation.
A copy of the trend data for residual gas components is attached for reference.
The total pressure (T.P.) indicated by the Q-mass is 1.33 × 10⁻³ Pa.
 Meanwhile, when the Q-mass was started up, the newly installed pressure gauge read 1.3 × 10⁻³ Pa.
 

Images attached to this comment
nobuhiro.kimura - 9:14 Wednesday 14 October 2026 (37663) Print this report

{Kimura}

 I am attaching a trend graph with the upper limit of the left vertical axis corrected to 1×10⁻⁴ Pa.
The partial pressure of H₂O shows a downward trend.

Images attached to this comment
nobuhiro.kimura - 8:58 Thursday 15 October 2026 (37671) Print this report

[Kimura]

 I am attaching a trend graph.
The partial pressure of H₂O shows a downward trend.

Images attached to this comment
Search Help
×