VIS (EY)takaaki.yokozawa - 9:33 Monday 28 September 2026 (37548)
Print this reportStatus of the SUM of the ETMY MN oplev light sourceTRA 50 -> 20 after recovered the blackout TILT 240 -> 90 after recovered the blackout VER 120 didn't change
Images attached to this report
Comments to this report:
takaaki.yokozawa - 9:44 Monday 28 September 2026 (37549)
Print this reportDan Chen-san commented me he operated with 1 mW output, but as shown in https://klog.icrr.u-tokyo.ac.jp/osl/?r=37529, The output value was not 1 mW, but more than 2 mW in current situation, that may cause decreasing of light source power, I will change it when I will go to the ETMY
takaaki.yokozawa - 10:50 Tuesday 29 September 2026 (37566)
Print this reportI requested the PAY_FLOAT state to ETMY. I changed the tilt/len oplev light source from 1.0 mW to 2.81 mW, rol/tra oplev light source from 1.0 mW to 2.79 mW. Then, the SUM values of QPD recovered before the blackout. I requested the LOCK ACQUISITION state and succeeded, but ETMY ROL was not center (seg1,2,3,4) = (1,1,26,21)