[Kimura, Yasui]
We vented OMT-OMMT chamber to atmospheric pressure.
9:17 Turned off the interlock system for GVommt / 3.3*10^-5 Pa
9:24 Closed the GVommt / 9.1*10^-4 Pa
9:32 Started pressurization / opened the ball valve about 15 degrees and the angle valve by two turns)
9:35 3.5*10^2 Pa
9:55 3.1*10^3 Pa
9:59 Increased air flow (opened the ball valve fully and the angle valve by two turns)
10:19 1.0*10^4 Pa
10:35 1.6*10^4 Pa
10:42 Increased air flow ( increased the regulator's secondary pressure from 1.5 to 2.0 kgf/cm^2 and opened the angle valve by two turns)
10:55 2.8*10^4 Pa
11:30 5.7*10^4 Pa
12:00 8.1*10^4 Pa
12:14 9.4*10^4 Pa ->9.6*10^4 Pa