tatsuki.washimi - 18:09 Monday 03 August 2026 (37310) Print this report
Temporal seismometer for the X-end outside

[Shaojin, Washimi]

We located the portable seismometer setup at the outside of the X-end and started measurements.

Images attached to this report
Comments to this report:
tatsuki.washimi - 23:15 Monday 17 August 2026 (37359) Print this report

[Shaojin, Washimi]

Today we finished the masurement at the X-end outside, and cleaned up out setup.

After that, we moved them and started at Mozumi area.

 

Images attached to this comment
tatsuki.washimi - 14:12 Friday 02 October 2026 (37599) Print this report

Today I finished the surface seismic measurement.

The batterlies were already empty and the data taking was stopped on September 22th.

Since the Y-axis signal looks to be strange, I checked the connector cables. Finaly I founf the cut pin and I  have fixed it.