PEM (Center)takaaki.yokozawa - 13:37 Tuesday 10 February 2026 (36326)
Print this reportInstallation of the accelerometers at the PSL roomI installed two portable accelerometers near the Shaker 1 and Shaker 4. During this work, I kept the LSC_LOCK guardian with observation state, and IFO kept locking(Turned on the light, work on the optical table).
ACC1 (near the shaker1, Left plot) K1:PEM-ACC_PSL_PORTABLE_1_OUT (no DQ channel...)
ACC2 (near the shaker2, Right plot) K1:PEM-ACC_PSL_PORTABLE_2_OUT (no DQ channel...)
If possible, I would like to restart the DAQ after changing the k1pemmcf0 model (add them to DQ channel) at the early morning 2/11(Wed)
Images attached to this report
Comments to this report:
takaaki.yokozawa - 8:33 Thursday 12 February 2026 (36334)
Print this reportI noticed they are DQ channel.