takaaki.yokozawa - 6:32 Wednesday 04 February 2026 (36270) Print this report
Cabling for the shaker injection at PSL room
[YokozaWashimi]

For the future shaker injection test at PSL room, we performed the cabling from the MCF0 rack to cable entrance at the PSL room.
We used the DAC0 9 - 12 ch.

We don't know this work affect or not, I found the model of the K1MCF0 was not working, as shown in Fig.1.
Images attached to this report
Comments to this report:
satoru.ikeda - 10:21 Wednesday 04 February 2026 (36272) Print this report

> We don't know this work affect or not, I found the model of the K1MCF0 was not working, as shown in Fig.1.

Status Check
 The status of k1mcf0 has been confirmed.

 All k1mcf0 models are dead (fig1)
 FEPC hung, occurring around 2026-2-4 2:20:24 (JST) (fig2)
 Upon checking the terminal screen, it had stopped due to factors such as a Kernel Panic (fig3)

Countermeasures
 Performed a reset via the BMC interface and rebooted.

Images attached to this comment
Non-image files attached to this comment
takahiro.yamamoto - 12:23 Monday 09 February 2026 (36318) Print this report
I restarted all models on k1mcf0, because models downed around 2:40am on Feb. 8th due to probably timing glitches.
The Front-end computer was alive at this time.