Preparation for GV-ommt Interlock Device Installation

[Kimura, Nakagaki and Ohino] 

 We have begun preparations for installing the GVommt interlock device.
The initial plan was to complete installation today, but it became apparent that time is needed for preparations such as routing network cables.
Therefore, we confirmed the installation location for the interlock control rack and placed it temporarily. Please refer to the attached photo for the temporary placement location.
 Next time, we plan to purchase the network cables, switches, and fiber optic cables and propose a schedule for their installation.

Images attached to this report
Comments to this report:
koji.nakagaki - 17:55 Monday 13 April 2026 (36737) Print this report

[YamaT, Kimura, Yasui, TakahashiM, SawadaH, Nakagaki]

We switched the remote monitoring system for the two CC-10 vacuum gauges (PV names K1:VAC-PRESSURE-CS-SRMGV and K1:VAC-PRESSURE-CS-OMMTGV) that will be used by the GV auto-closure device from Raspberry Pi to MOXA.