MIF (General)Hinata Takidera - 16:31 Sunday 23 November 2025 (35636)
Print this reportComment to Installation of high frequency data logger to Yend (35632)[Michimura, Takidera]
We have finished doing the BNC cabling to the data logger DL950. We used 5 m BNC cable to send the signals from EY0 rack to TMSY rack (Fig. 1), and monitored the output from Y_IR_PDA1 (Ch 9), Y_IRSPOL_PDA1 (Ch 11), and Y_IRPPOL_PDA1 (Ch 13) (Fig. 2).
Work log Entered the mine: 9:24 Entered Yend: 9:41 Exited Yend: 10:24 Exited the mine: 11:02 (All in November 23, 2025 in JST)