PEM (EX)takaaki.yokozawa - 12:59 Saturday 22 November 2025 (35629)
Print this reportComment to Preparation for the PEM injection at the TMSX (35615)This is a work 21st Nov.
For the TMSX/TMSY PEM injection, I performed the following real time model change and restart the model, reboot the DAQ at Friday Morning.
1. k1pemex0 added the related channel of the excitation added the _DQ channels for the temporal accelerometers.
2. k1pemey0 added the related channel of the excitation added the _DQ channels for the temporal accelerometers.
I entered the TMSX clean booth and exchanged the ACO power supply and removed the large shaker (Now, large shaker was placed at the center area(near the OMC area)) The detail can be found in https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16999