MIF (General)takaaki.yokozawa - 16:14 Tuesday 18 November 2025 (35592)
Print this reportSeveral notification during the lock loss study 18th Nov.I cannot finish the investigation of the lock loss study for current interferometer, I will write several notifications during the lock loss study.
1. MICH control signal became larger when the micro seismic motion became large Fig.1. showed the MICH related signal for the higher seismic motion (BLRMS(0.1 - 0.3 Hz)~1.0, 18th Nov. 00:00:00) Fig.2. showed the MICH related signal for the lower seismic motion (BLRMS(0.1 - 0.3 Hz)~0.1, 15th Nov. 21:00:00) As you can see, the MICH control signal would be twice.
2. Glitch like signal in the ITMX MN V1-V2 Fig.3. showed the some glitches in the ITMX MN COILOUTF V1-V3. There is several coincidence when the ITMX MN WIT R became larger number. (Also in LSC REFL PDA3 RF45 I ?)
3. Saturation of the POP PDA1 RF45 I signal. Fig.4. In several lock loss, the trigger would be the saturation of the PRCL error signal (POP PDA1 RF45 I signal), but I still not understand why the drift and saturation of the POP PDA1 RF45 I.
After finishing the investigation of the lock loss, I will post the report again