lockloss investigation on RF_LOCK data of 2025/10/04

I performed the lockloss investigation for the lockloss which happened between 2025/10/04 00:00~23:59 UTC. The previous lockloss investigation was posted in klog34736. During this period, there were 20 lockloss from the INCREASING_LAS_POWER state.  The plots are listed in DAC wiki.

      Commissioning activity

      The first 3 lockloss happened during the commissioning activity (klog). I will ignore them.

      Lockloss during increasing the laser power

      For 1 lockloss, the lockloss happened during increasing the laser power.
      Figure 1 shows the channels related to the PMC control. We can see the clear glitches on PSL-PMC_MIXER_MON_OUT_DQ. The timing of the glitches has the coincidence with the K1:PSL-PMC_HEATER_INMON and the step function of laser power. I'm not sure these are related to the lockloss.

      Lockloss just after increasing the laser power

      For 7 lockloss, the lockloss happened just after increasing the laser power. The lock duration at INCREASING_LAS_POWER were 290~305s. (Mainly 305s)  

      • This kind of lockloss started to occur after 2025-10-04 18:21:56.437500 JST. 
      • Figure 2 and 3 show the PMC channels and MCL channels. After finishing increasing the laser power, the glitches on PSL-PMC_MIXER_MON_OUT_DQ stopped somehow. Just after that, we can see the three glitches on K1:LSC-MCL_IN1_DQ and K1:LSC-MCL_OUT_DQ. We saw this phenomena sometimes.
      • The PRCL and MICH error signals show the transient and the fluctuation of the signals increased around -15 s. Figure 4 shows the example of different lockloss.

      Lockloss after some time from reaching the increased laser power

      For 5 lockloss, the lockloss happened after some time from reaching the the increased laser power. The lock duration at INCREASING_LAS_POWER is more than 300 s. After finishing increasing the laser power, the glitches on PSL-PMC_MIXER_MON_OUT_DQ didn't occur somehow. 
      For some of them, I found that PRCL and MICH show the transient behavior at -10s. Figure 4 shows the example. 

      Earthquake

      For 4 lockloss, we found the excess of the seismic motion including 1 Hz and typical earthquake.

      Images attached to this report
      Comments to this report:
      shinji.miyoki - 15:16 Sunday 05 October 2025 (35238) Print this report

      >Lockloss during increasing the laser power

      These glitches were generated by the motor of the 1/2 wave plate rotator to increase the injected laser power to IMC as reported before. However, lock loss can happen because of this vibration, it means that dynamic range for the feedback signals in PMC and IMC are insufficient. As you know, we have a lot of room to extend the dynamic range of EOM and PZT in the IMC loop by using HV amps.

       

      hirotaka.yuzurihara - 11:09 Monday 06 October 2025 (35241) Print this report

      I attached the list of gps time for each lockloss, based on the request by Kenta-san.