Reports 1-1 of 1 Clear search Modify search
MIF (General)
Shingo Hido - 19:44 Thursday 19 June 2025 (34296) Print this report
Spectrum and OLTF measurement on June 19 after the site work

We measured DARM spectrum and OLTF of DARM, MICH, and PRCL (fig1-4).
The PRCL measurement was interrupted as the lock was lost.
But, there is no significant difference on the spectrum and the OLTF, so the calibration should be fine.

Images attached to this report
Search Help
×

Warning

×