[Kenta, Guo chin, Yuzurihara]
We performed the lockloss investigation for the recent lockloss from the OBSERVATION state of the LSC_LOCK guardian, between 2025-04-14 01:23:52.562500 UTC and 2025-04-21 22:56:05.437500 UTC. The previous lockloss investigation was posted in klog33395. During this period, there were 38 lockloss.
Lockloss with the interferometer work
16 lockloss occurred in the WORKING_WITH_OBSERVATION_WITHOUT_LINES state. In adittion, 4 lockloss occurred during the excitation.
1Hz seismic motion made the IMC lockloss
For 10 lockloss, we saw the excess of the seismic motion with 1~10 Hz, which made the oscillation of the IMC length control and made the IMC lockloss.
The time and date are summarized below:
- 2025-04-14 14:03:02.937500 UTC
- 2025-04-14 16:49:36.312500 UTC
- 2025-04-14 22:56:15.062500 UTC
- 2025-04-16 11:59:28.562500 UTC
- 2025-04-19 03:25:06.437500 UTC
- 2025-04-20 00:00:35.187500 UTC
- 2025-04-20 04:39:51.812500 UTC
- 2025-04-21 13:11:54.062500 UTC
- 2025-04-21 13:59:55.187500 UTC
- 2025-04-21 16:50:17.687500 UTC
As commented by YamaT-san in klog33416, recently, the lockloss labeled by `IMCL` happened very frequently. For example, during this period, 15 lockloss (including the WORKING_WITH_OBSERVATION_WITHOUT_LINES) was labeled by `IMCL`.
It's a timing to investigate more and to model the lockloss mechanism.
I newly found that the noise excess is happring in oplev signals of IMMT1 pitch, IMMT2 pitch, PR2 pitch/yaw and PR3 pitch ( sometimes SR2 pitch, and SR3 pitch ) with the coincidence of IMC length excess. For other oplevs, I couln't find the excess.
Figure 1~4 show the example of the excess. This might be a hint to model the mechanism.
I heard the DQed CARM channels and the details of the CARM (IMC) feedback control from Kenta. Although I checked the feedback signals to EOM, PZT, and TEMP, there was no clear coincident excess. I will extend the analysis with the signals of REFL45.
I checked if the feedback signal to the coils of MCE was saturated or not. it was not saturated. (I forgot that the existance of OVF_MCE label in SYS_LOCKLOSS guardian.)
Under the investigation
For 2 lockloss, we need more investigation.
- 2025-04-19 05:21:55.062500 UTC
-
2025-04-21 01:18:43.187500 UTC
-
At -12 s, the excess in OMC DCPD, PRCL error signal can be seen. There was no excess in OMMT2 TRANS. (Fig) The alignment to OMC was bad at that time?
-
1.2 Hz oscillation in IRX and OMMT2 TRANS
- 2025-04-19 06:55:33.937500 UTC
- From -3 seconds of the lockloss, 1.2 Hz oscillation in IRX, IRY, and OMMT2 TRANS happened (Fig). The OMMT2 TRANS gradually increased and the lockloss happened.
- Coincident 1.2 Hz oscillation can be seen in DHARD P error signal and oplev sinal of the ITMY pitch and ETMY pitch.
1Hz and IMC length?
- 2025-04-21 00:24:38.437500 UTC
- Just before the lockloss, the IMC length error signal shows the oscillation. Just after the lockloss, the seismic motion started to increase. Although I'm not confident, I guess the time delay for seismic motion data occurred due to the application of the band limited RMS filter.
- This might have the same lockloss cause of `1Hz seismic motion made the IMC lockloss`.