MIF (General)takaaki.yokozawa - 7:43 Friday 04 April 2025 (33232)
Print this reportAlignment work 250404After the large earthquake, the alignment became worse and LSC_LOCK guardian stopped at the PRMI lock trial with ALS_DARM,CARM lock. So, I performed the initial alignment only for the PRMI, then PRFPMI_RF_LOCKED succeeded. Next, I tried to perform the OMC alignment with the following klog https://klog.icrr.u-tokyo.ac.jp/osl/?r=33214 Then, interferometer became stable.
Today, IPC glitch like signal detected so much (once per several minutes).